CamdenCreekstoneR1
Commercial
Extended Project Description
2260 Northwest Parkway • Suite H • Marietta, GA 30067 • 678-290-1325
Date of Issue:
2/7/18
Customer Information
Jobsite Information
Jeff Bradford Advanced Consctruction C678
Jeff Bradford Advanced Consctruction C678
Name:
Contact Name:
917 Honey Creek Road
Camden Creekstone 1945 Savoy Drive
Address:
Address:
conyers
State: GA
Zip: 30094
Atlanta
State: Ga
Zip: 30341
City:
City:
Phone: (678) 750-2970
Phone: (678) 750-2970
Cell: (770) 500-8792
Cell: (770) 500-8792
Fax:
Fax:
jbardford@advancedcontruction.biz
jbardford@advancedcontruction.biz
Email:
Email:
Stabilization of Settlement Condition
INSTALL (3) FOUNDATION PIERS: 1. Have utilities marked by locating service. Locating service marks from street to meter. If any private utilities are suspected in the work area, a private locating service must be contracted by owner. ESOG may provide recommendation upon request. 2. Excavate area to expose existing concrete footing. 3. Prep footing and attach galvanized foundation brackets for each pier under center load of footing. 4. Drive foundation piers up to 21’ through poor soil to load bearing strata. Should additional depths be required to develop the required load capacities, an additional charge of $28.00 per vertical foot, beyond 21’ will be added to the contract price if piers advance past 21’).
5. Use Foundation Piers to raise wall as close as possible to original elevation 6. Transfer load to piers to stabilize foundation against any further settlement. 7. Secure piers and backfill holes. 8. Clean work area and remove all work related debris.
PRESSURE GROUT FOR SUBGRADE STABILIZATION
1. Drill a series of 1.5” diameter holes 5-feet on-center throughout the affected area of parking deck (approx. 27’X54’) floor. 2. Drive the injection rods through the slab and through poor soil to suitable load bearing strata (estimated average depth of 10’-0”). 3. Force grout under pressure in 12” lifts to compact soil, build grout columns and fill any voids. 4. Estimated grout take is 750 cu. ft. based on industry standard calculations. Additional grout, if required, will be billed at $24.50/cu. ft. above the estimated volume stated above. The minimum daily charge is $2,900. See terms and conditions on page 2 of this contract for additional information. 5. Apply pressure at the upper lifts and attempt to return slab to a more level position.
Applicable Warranty – see terms and conditions in the attached warranty addendum
6. Patch holes using non- shrink grout. 7. Clean all construction related debris.
Customer Signature
form revision 8/19/13