CamdenCreekstoneR1

Commercial

Extended Project Description

2260 Northwest Parkway • Suite H • Marietta, GA 30067 • 678-290-1325

Date of Issue:

2/7/18

Customer Information

Jobsite Information

Jeff Bradford Advanced Consctruction C678

Jeff Bradford Advanced Consctruction C678

Name:

Contact Name:

917 Honey Creek Road

Camden Creekstone 1945 Savoy Drive

Address:

Address:

conyers

State: GA

Zip: 30094

Atlanta

State: Ga

Zip: 30341

City:

City:

Phone: (678) 750-2970

Phone: (678) 750-2970

Cell: (770) 500-8792

Cell: (770) 500-8792

Fax:

Fax:

jbardford@advancedcontruction.biz

jbardford@advancedcontruction.biz

Email:

Email:

Stabilization of Settlement Condition

INSTALL (3) FOUNDATION PIERS: 1. Have utilities marked by locating service. Locating service marks from street to meter. If any private utilities are suspected in the work area, a private locating service must be contracted by owner. ESOG may provide recommendation upon request. 2. Excavate area to expose existing concrete footing. 3. Prep footing and attach galvanized foundation brackets for each pier under center load of footing. 4. Drive foundation piers up to 21’ through poor soil to load bearing strata. Should additional depths be required to develop the required load capacities, an additional charge of $28.00 per vertical foot, beyond 21’ will be added to the contract price if piers advance past 21’).

5. Use Foundation Piers to raise wall as close as possible to original elevation 6. Transfer load to piers to stabilize foundation against any further settlement. 7. Secure piers and backfill holes. 8. Clean work area and remove all work related debris.

PRESSURE GROUT FOR SUBGRADE STABILIZATION

1. Drill a series of 1.5” diameter holes 5-feet on-center throughout the affected area of parking deck (approx. 27’X54’) floor. 2. Drive the injection rods through the slab and through poor soil to suitable load bearing strata (estimated average depth of 10’-0”). 3. Force grout under pressure in 12” lifts to compact soil, build grout columns and fill any voids. 4. Estimated grout take is 750 cu. ft. based on industry standard calculations. Additional grout, if required, will be billed at $24.50/cu. ft. above the estimated volume stated above. The minimum daily charge is $2,900. See terms and conditions on page 2 of this contract for additional information. 5. Apply pressure at the upper lifts and attempt to return slab to a more level position.

Applicable Warranty – see terms and conditions in the attached warranty addendum

6. Patch holes using non- shrink grout. 7. Clean all construction related debris.

Customer Signature

form revision 8/19/13

Made with FlippingBook - Online Brochure Maker