Engineered Solutions of Georgia

EXISTING EXTERIOR WALL

EXISTING SLAB

EXISTING FOOTING

NEW FOUNDATION SUPPORT BRACKET MECHANICALLY FASTENED TO EXISTING PERIMETER FOOTING

NEW RESISTANCE PIER SHAFT

SOIL / EARTH

RESISTANCE PIER LEAD SECTION ADVANCED TO LOAD BEARING STRATA

DRAWN BY

RESISTANCE PIER

OC

SCALE

N.T.S.

o f G e o r g i a Foundation Repair & Waterproofing

DATE

3/27/15

This drawing is the sole property of Engineered Solutions of Georgia. Reproducing or copying this drawing, in whole or in part, is prohibited without the express written permission of Engineered Solutions of Georgia. It is only to be used for the project designated herein and may not be used for any other project. It is to be returned upon request.

DRAWING NUMBER

ST-4

Made with FlippingBook flipbook maker