Engineered Solutions of Georgia
Alternative to sheet piling
Copenhagen Metro
The Copenhagen Metro cut and cover tunnel involved the excavation of a 12 metre deep cutting through flinty till. Soil nails were selected as the preferred method of stabilisation, replacing sheet piling due to the difficult ground conditions, efficiency and cost effectiveness:-
• Cut and cover tunnel
• Cost effective replacement for sheet piling
• Installation rate of 350 metres per day, per rig
• Maximum deformation of only 15 mm