Resistance Piers
Contract for Services
4500 Highlands Parkway • Smyrna, GA 30082 • 678-290-1325
Date of Issue: September 26, 2023
Jobsite Information
Customer Information
John Sauer
John Sauer
Name:
Name:
1704 Grove Park Way
1704 Grove Park Way
Address:
Address:
Decatur
Decatur
City:
City:
GA
GA
State:
State:
30033
30033
Zip:
Zip:
314-518-0283
314-518-0283
Phone:
Phone:
(314) 518-0283
(314) 518-0283
Cell:
Cell:
jwsauer611@gmail.com
jwsauer611@gmail.com
Email:
Email:
INSTALL (1) NEW-CON FOUNDATION PIERS: 1. Have utilities marked by locating service. Locating service marks from street to meter. If any private utilities are suspected in the work area, a private locating service must be contracted by owner. ESOG may provide recommendation upon request. 2. Excavate area to expose existing concrete footing. 3. Prep footing and attach foundation brackets for each pier under center load of footing. 4. Drive foundation piers unlimited depth 5. Transfer load to piers to stabilize foundation against any further settlement. 6. Secure piers and backfill holes. 7. Clean work area and remove all construction related debris. Notes: See terms and conditions for additional information. The client must be present during a lift because the process may cause cosmetic damage to wall. The magnitude of the lift is proportional to the amount of damage caused by the process. Repairs of any consequential damages caused by the lift are not included in this contract and are the responsibility of the owner. A quote for such repair may be provided upon request. INSTALL (1) STEEL SUPPORT COLUMNS TO INCLUDE FOOTINGS 1. Excavate areas to form and pour (1) new 18”x18”x1’-2” steel reinforced poured in place 3,000 psi concrete footings 2. Install code compliant schedule 40 steel support columns with screw adjuster, top cap and bottom plate. 3. Secure top plates to existing beam and anchor base plates to footings. 4. Attempt to return framing to a more level position (see notes) 5. Clean work area and remove all construction related debris. Note: Piers carries a lifetime warranty against no further settlement. Pier is unlimited depth. Portions of lattice and screen may be removed for installation. to be put back by others. See terms and conditions. 25R% deposit due upon confirmation.
Quotation valid for 30 days from the date of issue. Contract subject to terms and conditions printed on the accompanying addenda.
Customer Signature
Made with FlippingBook Digital Publishing Software