abredeensettlementinvestigation

LOG of BORING

Project Name:

The Aberdeen

Project No.: Boring No.:

4754.002.16

Client:

Engineered Solutions of Georgia

B-2

Location:

Vinings, Georgia

Date:

11/11/2016

Elevation

Description

Depth

Samples

Drilling Observations Hand Auger Boring

~1018 ft. MSL

Topsoil: 5"

(feet) No. Type DCP

No groundwater encountered

FILL: Rock-laden SILT, brown, some sand, dry to moist, non-plastic

at the time of drilling.

* DCP on rock fragments

1 DCP 10-13*

5.0

2 DCP 9-10

10.0

3 DCP 15+*

15.0

FILL: Sandy SILT, stiff, tan, brown, some rock fragments, trace mica, dry, non-plastic

4 DCP 15+*

20.0

trace organic debris and voids present 22' to 26'

LEGEND SPT= Standard Penetration Test SS = Split-Spoon (sample) DCP = Dynamic Cone Penetrometer

25.0

Sandy SILT, red, brown, trace mica, moist, low

GS= Ground Surface

TS = Top of Slab

plastic

HWR= Highly Weathered Rock PWR= Partially Weathered Rock

Boring Terminated @ 29'

Made with