abredeensettlementinvestigation
EXISTING EXTERIOR WALL
EXISTING SLAB
EXISTING FOOTING
NEW FOUNDATION SUPPORT BRACKET MECHANICALLY FASTENED TO EXISTING PERIMETER FOOTING
NEW RESISTANCE PIER SHAFT
SOIL / EARTH
RESISTANCE PIER LEAD SECTION ADVANCED TO LOAD BEARING STRATA
DRAWN BY
RESISTANCE PIER
OC
SCALE
N.T.S.
o f G e o r g i a Foundation Repair & Waterproofing
DATE
3/27/15
This drawing is the sole property of Engineered Solutions of Georgia. Reproducing or copying this drawing, in whole or in part, is prohibited without the express written permission of Engineered Solutions of Georgia. It is only to be used for the project designated herein and may not be used for any other project. It is to be returned upon request.
DRAWING NUMBER
ST-4
Made with FlippingBook